SEVESO Industrial facility in Malgrat de Mar

Conceptual Framework

-Active industrial facility on the Catalan coast. Site contaminated by waste of various types with presence of materials with asbestos.

-Goal: Excavation with management to class III-Dangerous landfill of those areas with many types of mixed waste. Manual triage of materials with asbestos in suitable areas.

Carried out operations

-Preliminary investigation of the extent of contamination by asbestos materials (surface and volume forecast).

-Differentiation of areas to be excavated and areas of manual triage.

-Manipulated volume: 3200 m3

-Manual triage volume: >2200 m3

-Tonnage managed to landfill >840 T.

Obtained results

-2 months of works.

-Evacuation of all materials with asbestos.

-100% of remaining soils are OK.

 