Conceptual framework
- Site without current activity with an area of 1.127 m2. It has historical industrial activity.
- There is a construction project to build a residential building.
- Both groundwater and soil have pollution values above the reference levels for urban use.
Actions
Detailed historical study + subsoil research
Quantitative analysis risk + waste characterisation
Excavation plan + selective excavation
EWM (environmental work management) + soil remaining validation.